HP Star Film Project Delayed -
Kenneth Branagh 's Roll in MI3 Delayed Summary:
Kenneth Branagh (Proffesor Lockhart) who is starring alongside, Tom Cruise, Carrie-Ann Moss and Scarlett Johansson in the second sequel of the Mission Impossible franchise, will see film delayed due to directorial conflicts.
Article:
Kenneth Branagh (Profesor Lockhart), who is starring alongside Tom Cruise, Carrie-Ann Moss and Scarlett Johansson in the second sequel of the Mission Impossible franchise (MI3), will see the film delayed due to directorial conflicts.
The project has already run into trouble after the drop out of two previous directors.
Quote:
However, original Mission: Impossible 3 director David Fincher dropped out in favour of directing skateboarding movie Lords of Dogtown, a project he has since left.*
Fincher was replaced with Joe Carnahan, who subsequently quit the film over "creative differences", Studio Babelsberg said.*
It will now be directed by Jeffrey Abrams, who created hit television series Alias.*
The first movie in the Mission: Impossible series, directed by Brian de Palma in 1996, grossed $454m (£250m) worldwide.*
Its John Woo-directed sequel took $546m (£300m) following its 2000 release."*
It is said the Tom Cruise will now use the filming delay to shoot the re-make of the classic 1960's movie The War of the Worlds from the works of the author H.G Wells, which is being directed by Steven Speilberg. Shooting for Mission Impossible 3 will now take place in the summer of 2005.*
Click here for the full story.
Source:
BBC Entertainment via
TheSnitch.co.uk.